Equinor Veslefrikk 24 well PP&A campaign

20th July 2022

Equinor required a provider for the permanent plugging and abandonment of 24 wells on their Veslefrikk A Installation. 

This included operations to pull tubing alongside ASV retrieval, cut & recover production and intermediate casing strings as well as milling subsea hangers on two of the wells.

The "One Team" Approach enabled; operational strategy and idea sharing alongisde advanced planning which led to almost zero downtime (45 minutes NPT over the 24 wells) whilst delivering impeccable planned and contingency P&A operations. This was delivered through our dedicated project managers and offshore personnel, ensuring continuity throughout the entire project.

Read more;

Veslefrikk PP&A CAse Study